Power Your Home. The Right Way.

EV chargers, Tesla Powerwall batteries, and solar โ€” installed by a licensed C10 contractor since 2006. Sacramento area.

๐Ÿ”Œ
EV Charger
๐Ÿ”‹
Battery
โ˜€๏ธ
Solar
๐Ÿ“Š
My Dashboard

Get Your EV Charger Quote

Answer a few questions โ€” takes about 60 seconds

What do you drive?

We'll recommend the best charger for your vehicle.

๐Ÿš—
Tesla
Model 3, Y, S, X, Cybertruck
๐Ÿ›ป
Ford / GM / Rivian
F-150 Lightning, Bolt, R1T, etc.
๐Ÿš™
BMW / Audi / VW
iX, e-tron, ID.4, etc.
๐Ÿš˜
Hyundai / Kia
Ioniq 5/6, EV6, EV9
๐Ÿ”‹
Other / Not sure

Choose your charger

Both are hardwired Level 2 chargers made by Tesla.

How far is your panel from where you park?

Measure the wire path โ€” up, across, and down. Don't worry about being exact.

Garage wall & ceiling Panel Charger 5ft โ†‘ โ† 18ft across โ†’ โ†“ 4ft Total: 5 + 18 + 4 = 27 feet

Not sure? No problem โ€” we'll estimate 20ft and adjust after install if needed.

What's your zip code?

We'll check if a permit is needed and include it in your quote.

โšก Your EV Charger Quote

Base install (hardwired, 4ft wire)$850
Chargerโ€”
Additional wire runโ€”
Wire run totalโ€”
Permit + drawingโ€”

Your priceโ€”

This is your install price based on the information you provided. Final price may be adjusted if actual site conditions differ. Any changes will be communicated before work begins.

Let's get you scheduled

We'll reach out within 1 business day to confirm your install date.

๐Ÿ“… Pick an install date

Optional โ€” you can also schedule later via the link in your confirmation email.

โ˜€๏ธ Morning
8am โ€“ 12pm
๐ŸŒค๏ธ Afternoon
12pm โ€“ 5pm

Skip โ€” I'll schedule later

๐Ÿ“‹ Install Agreement

Customerโ€”
Addressโ€”
Chargerโ€”
Install dateTo be scheduled
Quoted priceโ€”

Terms:

  • Quoted price is based on information provided by the customer.
  • Final price may be adjusted if actual site conditions differ.
  • Any price changes will be communicated and approved before work begins.
  • If providing your own charger, it must be on site before the installation date. Otherwise we supply at our listed price.
  • A $100 deposit is required to secure your install date. Applied toward total.
  • Balance due upon completion.

Secure payment. Deposit applied to your total.

Get Your Solar & Battery Quote

A few quick questions to size your system โ€” about 90 seconds

What are you looking for?

We'll tailor your quote based on what you need.

โ˜€๏ธ๐Ÿ”‹
Solar + Battery
New solar panels with Tesla Powerwall 3 โ€” maximum savings & backup power
๐Ÿ”‹
Battery Only
Add a Tesla Powerwall 3 to your existing solar or for backup power
โ˜€๏ธ
Solar Only
New solar panels without battery storage

What's your monthly electric bill?

This helps us size your solar system. Pick the closest range.

๐Ÿ’ก
Under $150/mo
Small system โ€” 4-6 kW
โšก
$150 โ€“ $300/mo
Medium system โ€” 6-10 kW
๐Ÿ”Œ
$300 โ€“ $500/mo
Large system โ€” 10-14 kW
๐Ÿ 
$500+/mo
Extra large system โ€” 14+ kW

Tell us about your roof

This affects installation method and timeline.

๐Ÿ 
Composition Shingle
Most common โ€” asphalt shingles
๐Ÿก
Tile (Concrete or Clay)
Common in CA โ€” requires special mounting
๐Ÿ—๏ธ
Metal / Standing Seam
๐Ÿข
Flat / TPO / Built-up
โ“
Not sure
Under 5 yrs
5โ€“15 yrs
15+ yrs
Not sure

How many Powerwalls?

Each Tesla Powerwall 3 provides 13.5 kWh of backup storage. Most homes need 1-2.

๐Ÿ”‹
1 Powerwall 3 โ€” $9,800
13.5 kWh ยท Covers essentials (lights, fridge, Wi-Fi, garage door)
๐Ÿ”‹๐Ÿ”‹
2 Powerwalls โ€” $18,100
27 kWh ยท Whole-home backup including AC and EV charging
๐Ÿ’ก What's included with each Powerwall:
โ€ข Tesla Backup Switch ($1,000) โ€” auto-switches to battery during outage
โ€ข Professional installation and commissioning
โ€ข Tesla app monitoring

What's your zip code?

We'll check permit requirements and sun hours for your area.

โ˜€๏ธ๐Ÿ”‹ Your Solar + Battery Estimate


Your priceโ€”

This is an estimate based on your answers. A site survey is required to confirm system design and final pricing. The site survey is free and takes about 30 minutes.

Schedule your free site survey

We'll come out, assess your roof and electrical panel, and give you a final quote โ€” no obligation.

โœ… You're all set!

We'll contact you within 1 business day to schedule your free site survey.

Nameโ€”
Phoneโ€”
Emailโ€”
Systemโ€”
Estimated net costโ€”

A confirmation email will be sent to the address you provided.

Why Apex Solar?

๐Ÿ”ง Licensed C10 Since 2006

Nearly 1,000 customers served. We know electrical โ€” it's all we do.

โšก Tesla Powerwall Certified

Factory-trained installer. Powerwall 3 exclusively โ€” the best battery on the market.

๐Ÿ“‹ Permits Handled

We pull the permit, schedule the inspection, and close it out. You do nothing.

๐Ÿ“ Local to Sacramento

El Dorado Hills, Folsom, Roseville, Rocklin, and surrounding areas.

Questions?

Call us at (916) 900-1234 or email david@apexsolarinc.com